skip to main | skip to sidebar

Studio Anne- Fall 07

Welcome to my studio!

Saturday, September 22, 2007

North Elevation


Regarding the South elevation- Entry vestibule redesign in progress. Also considering a vibrant color and its placement. Stay tuned...
Posted by Anne McQuown at 6:50 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Anne McQuown

Anne McQuown

Technical Links

  • Richardson College for the Environment
  • Radiant Hydronic Ceilings and Dedicated Outside Air System
  • BuildingGreen.com
  • Off-Peak Ice Cooling
  • Radiant Hydronic Panels
  • Construction Details All Types
  • Cement Board Sips
  • ICF and SIP 101

Blog Archive

  • ▼  2007 (61)
    • ►  October (23)
    • ▼  September (25)
      • Studio Final: Plans
      • Studio Final: Site and Roof Plan
      • Studio Final: Structure
      • Quick Perspective Sketches
      • Wrap Stair
      • West Elevation- Draft
      • North Elevation
      • Really Rough Elevation
      • Studio Final: Site Plan
      • Studio Final: Site Plan
      • Insulation Locations
      • Brick and Curtain wall
      • Details
      • Building Section- Mechanical and Environmental
      • Studio Final: Building Services
      • Conversation with Chris Schaffner 9.05.07
      • Clickable Structure Drawings
      • Studio Final: Structure
      • Third Floor Plan and Third Stair Location
      • Second Floor
      • Annotated Plan
      • In Progress models
      • In Progress Residential Tower
      • Slivers
      • Five Stories
    • ►  August (13)

About Me

Anne McQuown
View my complete profile